Concepts in Enterprise Resource Planning, 4th Edition
Ellen Monk; Bret Wagner
ISBN-10: 1-111-82039-2
ISBN-13: 978-1-111-82039-8
Chapter 2: The Development of Enterprise Resource Planning Systems
TRUE/FALSE
1. Individual information systems for each functional area in a company are known as silos.
ANS: T PTS: 1 REF: 20
2. Silos of information are also known as stovepipes.
ANS: T PTS: 1 REF: 20
3. The complex hardware and software that goes into an ERP system was not available until the 1970s.
ANS: F PTS: 1 REF: 21
4. The capabilities of computer hardware doubling every 18 months is known as Gates’ Law.
ANS: F PTS: 1 REF: 21
5. Scalability means that the capacity of a piece of equipment can be increased by adding new hardware.
ANS: T PTS: 1 REF: 22
6. The software that holds data in an organized fashion is known as a database management system, or a DBMS.
ANS: T PTS: 1 REF: 22
7. Materials requirements prediction (MRP) software allows a plant manager to plan production and raw materials requirements by guess-timation.
ANS: F PTS: 1 REF: 23
8. The direct computer-to-computer exchange of standard business documents is known as EDI, or electronic data interchange.
ANS: T PTS: 1 REF: 23
9. The functional model of business and management was useful for decades and is still the current school of thought.
ANS: F PTS: 1 REF: 24
10. SAP expanded into international markets but kept the software in a single language, German, and a single currency, the Euro.
ANS: F PTS: 1 REF: 26
11. SAP’s R/3 can only run on mainframe computers.
ANS: F PTS: 1 REF: 27
12. SAP’s goal was to develop a standard software product that could be configured to meet the needs of each company.
ANS: T PTS: 1 REF: 26
13. Old systems are known as legacy systems.
ANS: T PTS: 1 REF: 27
14. Open architecture encourages software companies are encouraged to develop add-on software
products that can be integrated with existing software, such as SAP’s R/3.
ANS: T PTS: 1 REF: 27
15. In the accompanying figure, data is entered into the system once and then used throughout the organization.
Figure 2-4 Data flow within an integrated information system
ANS: T PTS: 1 REF: 29
16. An ERP system allows data to be entered once, and then used throughout the organization.
ANS: T PTS: 1 REF: 29
17. An ERP module is a module that automates a specific business function.
ANS: F PTS: 1 REF: 31
18. A company’s level of data integration is highest when the company uses one vendor to supply all of its ERP modules.
ANS: T PTS: 1 REF: 31
19. An important consideration in minimizing the risk of fraud and abuse is defining limits on the dollar value of business transactions that certain employees can process.
ANS: T PTS: 1 REF: 32
20. A best practice is the best, most efficient way of handling a certain business process.
ANS: T PTS: 1 REF: 34
21. One benefit of ERP systems is that ERP integrates people and data while eliminating the need to update and repair many separate computer systems.
ANS: T PTS: 1 REF: 36
22. A large company will likely spent $1 million on ERP implementation, which includes software and training.
ANS: F PTS: 1 REF: 37
23. Not every company is a good match with the constraints inherent in ERP.
ANS: T PTS: 1 REF: 37
24. SAP’s internal programming language is Visual Basic.
ANS: F PTS: 1 REF: 38
25. A return on investment (ROI) is an assessment of an investment project’s value, calculated by dividing the value of the project’s benefits by the project’s cost.
ANS: T PTS: 1 REF: 39
MULTIPLE CHOICE
1. Individual information systems for each functional area in a company are known as:
a. | silos | c. | tubers |
b. | bagpipes | d. | separated systems |
ANS: A PTS: 1 REF: 20
2. The complex software and hardware required for ERP systems was not available until the
a. | 1960s | c. | 1980s |
b. | 1970s | d. | 1990s |
ANS: D PTS: 1 REF: 21
3. The observation that the number of transistors built onto a computer chip doubles every 18 months is known as:
a. | Moore’s Law | c. | Doubletake |
b. | Gate’s Prophesy | d. | Acceleration |
ANS: A PTS: 1 REF: 21
4. When a piece of equipment’s capacity is exceeded, its capacity can be increased by adding new hardware. This is commonly known as:
a. | adaptability | c. | scalability |
b. | middleware | d. | computability |
ANS: C PTS: 1 REF: 22
5. In the 1980s, ____, the technology that holds data in an organized fashion, existed for ERP development.
a. | spreadsheets | c. | client/server architecture |
b. | DBMS | d. | word-processors |
ANS: B PTS: 1 REF: 22
6. ____ software allows a plant manager to plan production and raw materials requirements by working backward from the sales forecast.
a. | DBMS | c. | MRP |
b. | EDI | d. | EFT |
ANS: C PTS: 1 REF: 23
7. The direct computer-to-computer exchange of standard business documents is known as:
a. | MRP | c. | EDI |
b. | | d. | DDS |
ANS: C PTS: 1 REF: 23
8. In a process-oriented company, the flow of information and management activity is ______, in line with the flow of materials and products.
a. | horizontal across functions |
b. | vertical from top level management down through the hierarchical management structure |
c. | vertical through functions |
d. | horizontal from marketing and sales to inventory and production |
ANS: A PTS: 1 REF: 24
9. Software ____ are individual programs that can be purchased, installed, and run separately, but extract data from the common database.
a. | nodes | c. | modules |
b. | chunks | d. | tidbits |
ANS: C PTS: 1 REF: 26
10. In ______, third-party software companies are encouraged to develop add-on software products that can be integrated with existing software.
a. | open architecture | c. | integrated pieces |
b. | clip-ons | d. | piecemeal nodes |
ANS: A PTS: 1 REF: 27
11. ____ is SAP’s biggest competitor.
a. | J.D. Edwards | c. | Microsoft |
b. | PeopleSoft | d. | Oracle |
ANS: D PTS: 1 REF: 28
12. Old information and computer systems are known as ______.
a. | dinosaurs | c. | legacy systems |
b. | passe systems | d. | relics |
ANS: C PTS: 1 REF: 27
13. Which ERP package is a popular software choice for managing human resources and financial activities at universities?
a. | SAP | c. | Microsoft Dynamics |
b. | PeopleSoft | d. | J.D. Edwards |
ANS: B PTS: 1 REF: 27-28
14. Which R/3 module records sales orders?
a. | SD | c. | PP |
b. | MM | d. | QM |
ANS: A PTS: 1 REF: 29
15. Which of the following modules in SAP ERP maintains production information?
a. | SD | c. | PP |
b. | MM | d. | QM |
ANS: C PTS: 1 REF: 29
16. The ______ module helps the company manage fixed-asset purchases (plant and machinery) and related depreciation.
a. | Plant Maintenance | c. | Materials Management |
b. | Asset Management | d. | Product Planning |
ANS: B PTS: 1 REF: 30
17. Which of the following module in SAP is a set of tools that can automate the activities in SAP ERP?
a. | Workflow | c. | Financial Accounting |
b. | Controlling | d. | Project System |
ANS: A PTS: 1 REF: 31
18. When top management is queried on the reasons for implementing ERP systems, the overriding answer is ____.
a. | cost saving | c. | increased profitability |
b. | control | d. | inventory management |
ANS: B PTS: 1 REF: 31
19. Which R/3 module records transactions in the general ledger?
a. | CO | c. | FI |
b. | WF | d. | PS |
ANS: C PTS: 1 REF: 31
20. After a company chooses the modules they want to implement, they must decide on ____ options, which allow the customer to customize the modules to fit their business to some extent.
a. | settings | c. | flexible |
b. | configuration | d. | tandem |
ANS: B PTS: 1 REF: 32
21. As part of the ______ process, a company can define any number of tolerance groups with a range of limits, and can then assign employees to these tolerance groups.
Figure 2-6 A customization example: tolerance groups to set transaction limits
a. | manufacturing | c. | configuration |
b. | development | d. | programming |
ANS: C PTS: 1 REF: 32
22. Which of the following is a benefit to running an ERP system?
a. | Global integration |
b. | Elimination of updating and repairing multiple systems |
c. | Capability to manage operations, not just monitor them |
d. | All of the above are benefits |
ANS: D PTS: 1 REF: 36
23. An ERP system for a large company will cost ____, including software, training, and implementation.
a. | $100-500 million | c. | $1-5 billion |
b. | $1-5 million | d. | $50,000-$500,000 |
ANS: A PTS: 1 REF: 37
24. SAP’s internal programming language is called:
a. | R/3 | c. | Visual Basic |
b. | C++ | d. | ABAP |
ANS: D PTS: 1 REF: 38
25. One assessment of a project’s value is calculated by the:
a. | DVT | c. | ROI |
b. | PMT | d. | PPT |
ANS: C PTS: 1 REF: 39
26. Bumpy rollouts of ERP systems are usually caused by:
a. | software problems | c. | hardware problems |
b. | people problems | d. | configuration problems |
ANS: B PTS: 1 REF: 40
COMPLETION
1. ____________________ states that the number of transistors on a computer chip doubles every 24 months.
ANS: Moore’s Law
PTS: 1 REF: 21
2. A central-local computer arrangement is called ____________________ architecture.
ANS:
client server
client/server
client-server
PTS: 1 REF: 22
3. ____________________ means that the capacity of a piece of equipment can be increased by adding new hardware.
ANS:
Scalable
Scalability
PTS: 1 REF: 22
4. The software that holds that data in an organized fashion, and that allows for the easy retrieval of data, is the ____________________.
ANS:
database management system
DBMS
database management system (DBMS)
DBMS (database management system)
PTS: 1 REF: 22
5. ____________________ software allows a plant manager to plan production and raw materials requirements by working backward from the sales forecast.
ANS:
MRP
material requirements planning
material requirements planning (MRP)
MRP (material requirements planning)
PTS: 1 REF: 23
6. The prediction of future sales is the ____________________.
ANS: sales forecast
PTS: 1 REF: 23
7. ____________________ is the direct computer-to-computer exchange of standard business documents.
ANS:
Electronic data interchange
EDI
Electronic data interchange (EDI)
EDI (electronic data interchange)
PTS: 1 REF: 23
8. Originially, in English, SAP was an acronym for ____________________.
ANS: Systems Analysis and Program Development
PTS: 1 REF: 25
9. In ____________________, third-party software companies are encouraged to develop add-on software products that can be integrated with existing software.
ANS: open architecture
PTS: 1 REF: 27
10. Old systems are known as ____________________.
ANS: legacy systems
PTS: 1 REF: 27
11. SAP’s biggest competitor is ____________________.
ANS: Oracle
PTS: 1 REF: 28
12. The ____________________ records sales orders and scheduled deliveries. Information about the customer (pricing, address and shipping instructions, billing details, and so on) is maintained and accessed from this module.
ANS:
Sales and Distribution
SD
Sales and Distribution (SD)
SD (Sales and Distribution)
PTS: 1 REF: 29
13. When data are entered into the system, data in all related files in the ____________________ are automatically updated.
ANS: central database
PTS: 1 REF: 33
14. R/3’s design incorporates ____________________, which means that R/3 designers choose the best, most efficient ways in which business processes should be handled.
ANS: best practices
PTS: 1 REF: 34
15. SAP’s internal programming language is ____________________.
ANS:
ABAP
Advanced Business Application Programming
Advanced Business Application Programming (ABAP)
ABAP (Advanced Business Application Programming)
PTS: 1 REF: 38
16. ____________________ help businesses customize the software to fit their unique needs.
ANS: configuration
PTS: 1 REF: 38
17. An assessment of an investment’s project value that is calculated by dividing the value of the project’s benefits by the value of the project’s cost is known as a(n) ____________________.
ANS:
ROI
return on investment
return on investment (ROI)
ROI (return on investment)
PTS: 1 REF: 39
SHORT ANSWER
1. The accompanying figure depicts Moore’s Law. What significance does this law have with regard to the development of ERP systems?
Figure 2-1 The actual increase in transistors on a chip approximates Moore’s Law
ANS:
Computers had to be powerful enough to provide integrated, real time data for decision making
PTS: 1 REF: 21
2. Describe how information is exchanged between lower operating levels in the functional organization shown in the accompanying figure.
Figure 2-2 Information and material flows in the functional business model
ANS:
No exchange of information occurs between lower operating groups. Instead, exchange of information between operating groups is handled by top management which might not be knowledgeable about the functional area.
PTS: 1 REF: 24
3. Describe how information is exchanged between lower operating levels in the business process model shown in the accompanying figure:
Figure 2-3 Information and material flow in a process business model
ANS:
Information can flow between operating levels without top management’s involvement.
PTS: 1 REF: 25
ESSAY
1. Besides the fact that ERP systems are integrated information systems and lead to more efficient business processes, there are other benefits. Outline them.
ANS:
The significance of ERP lies in its many benefits. Recall that integrated information systems can lead to more efficient business processes that cost less than those in unintegrated systems. In addition, ERP systems offer the following benefits:
· ERP allows easier global integration. Barriers of currency exchange rates, language, and culture can be bridged automatically, so data can be integrated across international borders.
· ERP integrates people and data while eliminating the need to update and repair many separate computer systems. For example, at one point, Boeing had 450 data systems that fed data into its production process; the company now has a single system for recording production data.
· ERP allows management to actually manage operations, not just monitor them. For example, without ERP, getting an answer to “How are we doing?” requires getting data from each business unit and then analyzing that data for a comprehensive, integrated picture. The ERP system already has all the data, allowing the manager to focus on improving processes. This focus enhances management of the company as a whole, and makes the organization more adaptable when change is required.
PTS: 1 REF: 36
2. Discuss the various costs associated with the implementation of an ERP system for a large company and for a midsize company. How long does implementation take?
ANS:
The total cost of an ERP system implementation includes several factors, including the following:
· The scale of the ERP software, which corresponds to the size of the company it serves
· The need for new hardware capable of running complex ERP software
· Consultants’ and analysts’ fees
· Length of time required for implementation (which causes disruption of business)
· Training (which costs both time and money)
A large company, one with well over 1,000 employees, will likely spend $100 million to $500 million for an ERP system with operations involving multiple countries, currencies, languages, and tax laws. Such an installation might cost as much as $30 million in software license fees, $200 million in consulting fees, additional millions to purchase new hardware, and even more millions to train managers and employees—and full implementation of the new system could take four to six years.
A midsize company (one with fewer than 1,000 employees) might spend $10 million to $20 million in total implementation costs and have its ERP system up and running in about two years.
PTS: 1 REF: 36-37
3. Discuss the reasons behind a bumpy rollout of an ERP system. Cite some real examples.
ANS:
You can find numerous cases of implementation woes in the news. W. L. Gore, the maker of GoreTex fabric, had problems implementing its PeopleSoft system for personnel, payroll, and benefits. The manufacturer sued PeopleSoft, Deloitte & Touche LLP, and Deloitte Consulting for incompetence. W. L. Gore blamed the consultants for not understanding the system and leaving its Personnel department in a mess. PeopleSoft consultants were brought in to resolve the problems after implementation, but the fix cost W. L. Gore additional hundreds of thousands of dollars.
Hershey Foods (now The Hershey Company) had a rough rollout of its ERP system in 1999, due to its use of what experts call the “Big Bang” approach to implementation, in which huge pieces of the system are implemented all at once. Companies rarely use this approach because it is so risky. Hershey’s order-processing and shipping departments had glitches that were being fixed as late as September. Because of that, Hershey lost a large share of the Halloween candy market that year.
Usually, a bumpy rollout and low ROI are caused by people problems and misguided expectations, not computer malfunctions:
· Some executives blindly hope that new software will cure fundamental business problems that are not curable by any software. The root of a problem may lie in flawed core business processes. Unless the company changes its business processes, it will just be computerizing an ineffective way of doing business.
· Some executives and IT managers don’t take enough time for a proper analysis during the planning and implementation phase.
· Some executives and IT managers skimp on employee education and training.
· Some companies do not place the ownership or accountability for the implementation project on the personnel who will operate the system. This lack of ownership can lead to a situation in which the implementation becomes an IT project rather than a company-wide project.
· Unless a large project such as an ERP installation is promoted from the top down, it is doomed to fail; top executives must be behind a project 100 percent if it is going to be successful.
· A recent academic study attempting to identify the critical success factors of ERP implementations showed that a good project manager was critical and central to success of a project. In addition, training was crucial—along with a project champion, that is, someone who might not be in the CEO role but who brings enthusiasm and leadership to a project.
· ERP implementation brings a tremendous amount of change for users of the system. Managers need to effectively manage that change in order to ensure a smooth implementation.
Many ERP implementation experts emphasize the importance of proper education and training for both employees and managers. Most people will naturally resist changing the way they do their jobs. Many analysts have noted that active top management support is crucial for successful acceptance and implementation of such company-wide changes.
PTS: 1 REF: 40-41
Chapter 2:
The Development of Enterprise Resource Planning Systems
Another Look
Tolerance Groups
Responses will vary but may include the following:
- Maximum cash discount percentage allowed
- Maximum amount the employer can enter as a line item in a customer account
Tolerance groups are created to prevent fraud and to provide limits on employee action.
Sustainability and ERP
Responses will vary. In the corporate world, sustainability is one of the driving forces of innovation. The stakes are high but the financial rewards can be significant. Companies are learning that early movers in this area will develop competencies that rivals will envy.
ERP Allows for Bakery Chain Expansion
Responses will vary. An ERP could provide:
- Automated business processes that cut costs
- Improved financial management
- Access to real-time information about sales, expenses, inventory, etc.
- The ability to make more informed decision that fuels growth
- Increase in customer satisfaction
Buyer Beware: Check that Contract
Responses will vary. In order to comprehend ERP licensing models, it is important that clients understand their own requirements.
What could customers do to ensure a contract contains all possible eventualities?
Negotiate a Long-Term License Deal. Rather than focusing solely on the immediate purchase, it is more important to view the acquisition of ERP software as a long-term deal. Since most implementations take between one and two years (longer for larger organizations) and another one to two years to realize the benefit from these implementations, it rarely makes sense to front-load license contracts to acquire the software all at once.
Instead, companies should purchase what they need when they need it and pre-negotiate the price on future purchases to avoid unanticipated license cost increases. For example, we typically negotiate deals for our clients allowing them to purchase additional licenses, modules, or users at pre-defined costs for three years or more, while at the same time minimizing their up-front capital outlays.
Source: http://www.backbonemag.com/Backblog/erp-software-licensing-common-gotchas-to-look-out-for.aspx
Exercises
1. Moore’s Law is said to be more of a trend, rather than a representation of the actual number of transistors on a silicon chip. What is the current status of Moore’s Law? If it is not exactly holding true, what does this mean for the future of the computing industry?
Moore’s Law was coined by Intel employee, Gordon Moore, in 1965. He predicted that the number of transistors built into a computer chip would double every 18 months. Overall, this is significant because his law is still holding true today. Specifically, it’s significant for the development of ERP systems because they need great computing power. Without the rapid growth of computing power, as predicted by Moore’s Law, we could not run the large ERP systems.
2. What are the main characteristics of an ERP system? What are some newly developed features of ERP systems?
Main characteristics of an ERP system:
1. Single database
2. Consistent information
3. Management control
4. Open architecture
5. Global integration
6. Easier maintenance due to one system, not many legacy systems
Newly developed features of ERP systems:
1. ASAP – Accelerated SAP implementation methodology
2. BW – Business Warehouse
3. BI – Business Intelligence
4. CRM – Customer Relationship Management
5. NetWeaver
3. Imagine that your uncle owns and operates a construction company. The company owns a number of very expensive pieces of machinery, such as backhoes, for building houses and apartment buildings. Up until now, your aunt has “taken care of the books” by keeping financial records by hand.
However, business is picking up, and she has gotten far behind in filing taxes, paying bills, and so on. Write a persuasive essay to your uncle about why he needs an ERP system and how it would help with not only the burden of billing, payroll, and filing taxes, but also with keeping track of the company’s expensive machinery. Use the Internet for research.
Responses will vary. Students may point out that an ERP system allows data to be entered once, and then used throughout the organization. For example, with access to real-time information about contracts, labor costs, material costs, inventory, account balance, etc., your uncle will be able to confirm availability of equipment, assign jobs, prepare invoices, pay bills, and update projects.
4. Much has been written in the news media about ERP systems, both in print and online. Using library resources or the Internet, report on one company’s positive experience with implementing an ERP system, and on another company’s disappointing experience.
Responses will vary. One story about a positive experience can be found here:
§ http://www.itworld.com/small-business/55433/inside-one-saps-smallest-erp-success-stories
Unsuccessful stories can be found here:
§ http://www.computerworld.com/s/article/9195201/ERP_woes_blamed_for_lumber_company_s_bad_quarter
§ http://www.cio.com/article/681055/SAP_Project_Woes_Impact_Ingram_Micro_s_Profits
§ http://www.cio.com/article/486284/10_Famous_ERP_Disasters_Dustups_and_Disappointments
5. Some of the examples shown in this chapter are from a traditional ERP system, SAP. Consider some smaller ERP systems. Look on the Internet at Business One by SAP, and an additional smaller system, such as Pronto software or Exact software. Compare two of the systems, and list the similarities between the module-type offerings. Are there any clear differences between them?
Responses will vary.
Business One by SAP – Supply Chain Management | Pronto Software – Supply Chain Management |
Faster responsiveness to changes in supply and demand | Customer Service Management |
Optimized inventory with greater forecast accuracy and market visibility | Procurement Management |
Increased perfect order fulfillment with integrated planning and logistics | Product Development and Commercialization |
Reduced operational expenses and transportation spend | Manufacturing Flow Management |
Improved warehouse efficiency with automated processes and tighter controls | Warehouse Management |
Physical Distribution |
6. Visit CIO magazine’s Web site, www.cio.com, and conduct a search on ERP. Based on the search results, choose an example of an ERP implementation, and write a memo to your instructor describing the implementation. Discuss ways in which you think the company adopting the ERP system could have improved its implementation.
Responses will vary.
Maple Leaf Foods – SAP Implementation
§ Started with 35 separate ERP systems, each with its own processes
§ Goal: Institute one instance of SAP thus enabling common processes across the company
§ Time frame: Four years
§ The team adopted three golden rules: “Don't change the software; adapt our processes to the software, not vice versa; and ensure the integrity of the data that feeds the software.”
Source: http://www.cio.com/article/698681/Maple_Leaf_Foods_Digests_Rapid_Vanilla_ERP_Transformation
7. [Challenge Exercise] From your university’s electronic library, obtain a copy of the article, “Management Based Critical Success Factors in the Implementation of Enterprise Resource Planning Systems,” by Joseph Bradley (International Journal of Accounting Information Systems, Volume 9, no. 3, pages 175-200, September 2008). Write a three-page paper on the findings of this study concerning factors critical to the success of an ERP implementation. Choose five factors you think are most important, and focus your writing on those five.
Responses will vary based on what the student discovers in his or her research.
I want to share a testimony on how Mr Pedro loan offer helped my life,
ReplyDeleteIt isn't a good idea to use a payday loan on a regular basis. In the event that you endlessly prolong your repayment date and borrow often towards your subsequent paycheck, it could run you a good amount of money. However, it is just as sensible to decide on payday loans as they can be swiftly approved exactly the same day you put in your loan application form. You can contact Mr Pedro loan offer because my payday loan was very fast to proceed, email pedroloanss@gmail.com to request any kind of loan. Whatsapp +18632310632
Concepts in Enterprise Resource" delves into business operations optimization. This phrase hints at a deep exploration of streamlining processes and integrating resources for efficiency. How Save Page Such insights offer a holistic understanding of how enterprises manage their assets.
ReplyDelete